More hard work, a weekend with a bricksaw (luckily it was sunny so the solar panels helped reduce the energy use. The saw was required to cut the angles on the bricks so that the dome took shape without too much refractory mortar required.
With the brickwork finished and the chimney in place... Hmmm! can almost smell those pizzas already!
Charles made a fairly solid door for the front out of some of the hard wood we had left over from the Guest room build. lined inside with a sheet of thin steel to keep the heat in and to protect the door.
The insulation layer of vermiculite is then spread over the brickwork, this in retrospect, should have been replaced by a fibreglass insulation blanket which would have allowed for the expansion of the chamber more than the vermiculite does.